Institut für neue Industriekultur
Latest news
The Institute
The work of INIK
Projects
INIK-building
Strategic Planning + Design
Ressource Conservation + Historic Preservation
Clothing building
„Alhambra“ cinema
Settlement “Auf dem Sande” in Luckenwalde
Briquetting Plant Louise
Europe 1
Feasibility Study Textile Museum Forst (Lausitz)
Reconstruction of Borsighalle
Familiengarten Eberswalde
Maßnahmenplan Wartburg Pavillion
Re-Use Furnierhalle
Feasibility Study Energiefabrik
Wartburgpavillon Eisenach
Management Furnierhalle
Stadtbad Luckenwalde
Estrich House in Jüterbog
Joint Building Venture Idastrasse
Unknown Modernism 2019
Knappenrode
Ostmoderne
ENI in Zittau
Eisenhüttenstadt
Architecture, settlement, cultural landscape
Topomomo
Gdansk Docks
Old Leipzig Fair
Borsighalle
Kraftwerk Hirschfelde
Boyacá
Information and Documentation Center Borna
Industrial Buildings as a Resource
Factory becomes "House of the Families"
The House Schminke in Löbau
The Train Station in Welzow
Energy Hall in Guben
NWWK
The Bridge Lübbenau
The Health Center in Senftenberg
Völklinger Hütte
Urban Redevelopment + Structural change
Climate change + Energetic urban development
Participation + Civic Engagement Research
Regional economies + Cultural Tourism
Publications
Partners
Imprint
Sebstian Hettchen INIK
Europe 1
Conservation and Re-Use of Transmission Hall
-0,5
   

Since 2015 the 86 meters long and 16 meters high Transmission Hall “Europe 1” made of pretensioned concrete is not in use anymore. The building was formerly in use by the French longwave transmitter “Europe 1” (2.000 kw) near Felsberg / Beris in the State of Saarland. The building is one of the most impressive European monuments of the post-war era. Since 1999 the transmitter that started in 1955 is protected as a monument. The architects were Jean-François Guédy and Eugene Freyssinet. Owner is the municipality of Überherrn. INIKs task was to develop a re-use concept including the building documentation and architectural research.

Management: Sebastian Hettchen
Period: 2017 bis 2018
Organization: INIK GmbH
Auftraggeber: Gemeinde Überherrn
Cooperation: Lorenz & Co. Ingenieure
Topics: strategic site management, architectural research, conservation




     Print-Version