Institut für neue Industriekultur
Latest news
The Institute
The work of INIK
Projects
INIK-building
Strategic Planning + Design
Prison as a memorial in Cottbus
Clothing building
„Alhambra“ cinema
Pioneers of the Vogtland region
Market Hall Rostock
Briquetting Plant Louise
Europe 1
Operator Model for Slavic Fort
Feasibility Study Textile Museum Forst (Lausitz)
Energy Cluster
Reconstruction of Borsighalle
Familiengarten Eberswalde
Re-Use Furnierhalle
Feasibility Study Energiefabrik
Management Furnierhalle
Estrich House in Jüterbog
Joint Building Venture Idastrasse
ENI in Zittau
Knappenrode
Gdansk Docks
Old Leipzig Fair
Borsighalle
Kraftwerk Hirschfelde
Boyacá
Fabrica de Licores
Information and Documentation Center Borna
REKULA and SHIFT-X
Industrial Buildings as a Resource
Factory becomes “House of the Families”
The House Schminke in Löbau
Rose Garden and Industrial Culture
The Train Station in Welzow
Schwarze Pumpe
Energy Hall in Guben
NWWK
The Bridge Lübbenau
Ressource Conservation + Historic Preservation
Urban Redevelopment + Structural change
Climate change + Energetic urban development
Participation + Civic Engagement Research
Regional economies + Cultural Tourism
Publications
Partners
Imprint
Gdansk Docks
Capacity analysis of waterfront area
10
   

The dockside quarter in Gdansk worldwide known for the rise of the Solidarność movement is currently converted into a waterfront area including several new buildings. The project managers are a group of private investors. The City of Gdansk supports the project. The idea is that the waterfront area should connect the waterways of the docks to the historic city center. The project is an ambitious undertaking of the current city development that sets new standards for the entire troimiasto region (Gdansk, Gdynia, Sopot). After the accomplishment of several building projects the local Wyspa Institute of Art, the Technical University of Gdansk and the Państwowa Wyższa Szkoła Zawodowa w Nysi – supported by the INIK GmbH – set up a capacity analysis of the waterfront area. The idea was to critically check the current direction of the project and to propose design plus planning adjustmenst. Starting point of the analysis was an architectural workshop in April 2013 that focused on the capacities of local creative industries and new methodologies of participation.

Management: Sebastian Hettchen
Period: 2013
Organization: INIK GmbH
Topics: industrial culture, preservation planning, site development





     Print-Version